Metronet, Wheel Lathe and Train Wash Facilities

Client: Metronet
Location: Upminster Depot, Cranham, Essex
Main Contractor: Mowlem Civil Engineering Ltd.
Scope of Works: 180 tonnes Structural Steelwork to portal framed building.
20 tonnes Brake Pit Track Support Steelwork
80 tonnes Structural Steelwork to Train Wash Platform.
900 sq m PcP Pressed Grating flooring.
350m Galvanised tubular handrailing.
Fire escapes and ladders.
Order value: £475,000

<< back